Please use this identifier to cite or link to this item: http://thuvienso.dut.udn.vn/handle/DUT/5859
DC FieldValueLanguage
dc.contributor.advisorTS. Lê, Thị Huỳnh Anhen_US
dc.contributor.authorVõ, Như Quỳnhen_US
dc.date.accessioned2025-04-04T03:24:59Z-
dc.date.available2025-04-04T03:24:59Z-
dc.date.issued2023-
dc.identifier.urihttp://thuvienso.dut.udn.vn/handle/DUT/5859-
dc.description91 tren_US
dc.description.abstractChapter 1: Introduction; Chapter 2: Theoretical basis; Chapter 3: Introduction and analysis of current operations at D Company; Chapter 4: Optimizing the warehouse area; Chapter 5: SMED application reduces downtime in the production process at KS/VK; Chapter 6: Evaluation and Conclusion.en_US
dc.language.isovien_US
dc.publisherTrường Đại Học Bách Khoa - Đại học Đà Nẵngen_US
dc.subjectApplication SMEDen_US
dc.subjectProduction processen_US
dc.subjectOptimizing the warehouse areaen_US
dc.titleOptimization of PSME warehouse area and application SMED to improve the production process at KS/VK factory of D Vietnam Company.en_US
dc.typeĐồ ánen_US
dc.identifier.id6.DA.24.584-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.cerifentitytypePublications-
item.openairetypeĐồ án-
item.fulltextCó toàn văn-
item.grantfulltextrestricted-
item.languageiso639-1vi-
Appears in Collections:DA.Quản lý công nghiệp
Files in This Item:
File Description SizeFormat Existing users please Login
6.DA.24.584.VoNhuQuynh.pdfThuyết minh2.55 MBAdobe PDFThumbnail
Show simple item record

CORE Recommender

Page view(s) 20

15
checked on Jun 7, 2025

Download(s)

2
checked on Jun 7, 2025

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.